Wind farm

In construction

Located in Haute-Marne, the "Vannier-Amance" wind farm will have 17 wind turbines spread over 3 municipalities. The wind turbines will be installed on both sides of national road number 19 which links Vesoul and Langres. Construction of the wind farm began in 2020 and it will be commissioned in 2021. Vannier-Amance will produce the equivalent of the electricity consumption of the inhabitants of Châlons and

Vannier Amance

  • item icon

    17 EN 131 – 2.5

  • item icon

    Total
    capacity:
    42,5 MW

  • item icon

    Number of people
    supplied with electricity:
    50 700