Wind farm

Built

Located in Haute-Marne, the "Vannier-Amance" wind farm has 17 wind turbines spread over 3 municipalities. The wind turbines is installed on both sides of national road number 19 which links Vesoul and Langres.  It has been commissioned in summer 2022. Vannier-Amance produces the equivalent of the electricity consumption of the inhabitants of Chaumont, Langres and Saint-Dizier.

Press kit

Vannier Amance

  • item icon

    17 EN 131 – 2.5

  • item icon

    Total
    capacity:
    42,5 MW

  • item icon

    Number of people
    supplied with electricity:
    51 000